Jobsite Procedures
Our proactive approach to accident prevention begins long before the first coat of paint is applied.
Proactive Risk Management
Lydia Painting utilizes an extensive, 100-point Safety Audit Checklist to identify potential hazards, verify the proper use of PPE, and ensure compliance with all site-specific safety plans.
Job Hazard Analysis (JHA)
Conducted daily to identify existing and predictable hazards in the surroundings or working conditions. Analysts outline specific hazard controls before work begins.
Toolbox Talks
Weekly safety meetings are held on-site to review the Emergency Action Plan, reinforce proper PPE usage, and discuss specific hazards related to the current phase of construction.
Core On-Site Requirements
- Mandatory use of hard hats, safety glasses, and high-visibility vests.
- Ground Fault Circuit Interrupter (GFCI) protection on all electrical equipment.
- Immediate removal of damaged tools or uninspected ladders.
- Strict adherence to Lockout/Tagout programs.
